Preparations

Luckily I have not been in paid work for 6 months so have had time to concentrate on the boats preparations.
This has included all the little jobs on an on-going list as well as numerous others as I have found them.
The main jobs over the last year have been; fitting a Hydravane wind steering; fitting 2 new port hatches above the saloon to give more light; renewing deck head coverings; extensive inventory and rationalization of all the equipment and spare gear; repainting of deck; fitting an AIS; having a new cockpit cover made.
Boat is now stored up and ready for our around Britain adventure.

Planned 2 year route

Comments

  1. Now who could guess you are an engineer! Wifey

    ReplyDelete
  2. Fair winds to the both of you - Roy :)

    ReplyDelete
  3. 'Rationalisation of all the equipment' I hope that includes plenty of tea and a radio tuned to Radio 4 at 7pm week nights! 😀

    ReplyDelete

Post a Comment

Popular posts from this blog

2022 Fourth Leg - Weymouth to Gosport

2022 - Second Leg - Penzance to Plymouth